Oct
15
2007

Progress so far

Well the men arrived yesterday morning at 8.30am, by 9.15am my kitchen was sitting outside on the grass. Then I spent the day going back and forth to B&Q collecting stuff that hadn’t been delivered and buying tiles and flooring. By the time I got home from lunch at 3.30pm my new kitchen was pretty much in, the (gorgeous) new oven is in but not yet working and I had a sink with running water.

They worked hard all day and so far I can’t fault them. Tonight the electrician is coming over to put some more plug sockets in and the plasterer is coming to give me a quote. Tomorrow the men are coming back to do the tiling and flooring and put the doors on the cabinet. Then I should be able to get things back into the kitchen.

By last night I was starting to feeling pretty poorly and I have come down with a cold that has left me feeling rotten. Thank goodness the workmen were not planning to come in today. I did manage to go out with Mark for dinner last night. Well, if you can class a pudding and wine as dinner then we had dinner!

I hope the end of the chaos is in sight. Pictures to follow when i can find my camera under the rubbish in my lounge!!

Written by Anna Williams in: Uncategorized |

No Comments »

RSS feed for comments on this post.

Leave a comment

Design: TheBuckmaker.com WordPress Themes